Proposed port management model to modernize selected LGU-port enterprises towards the development of an efficient and financially viable transport network system / (Record no. 27615)

000 -LEADER
fixed length control field 12865nam a2201249Ia 4500
000 - LEADER
fixed length control field 11001ntm a2200205 i 4500
001 - CONTROL NUMBER
control field 69416
003 - CONTROL NUMBER IDENTIFIER
control field 0
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250920174303.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 171122n 000 0 eng d
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
Canceled/invalid LC control number
--
--
LC control number
NUCMC control number
015 ## - NATIONAL BIBLIOGRAPHY NUMBER
Source 2
National bibliography number
016 ## - NATIONAL BIBLIOGRAPHIC AGENCY CONTROL NUMBER
Source
--
Record control number
Canceled/invalid control number
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
--
--
International Standard Book Number
--
Canceled/invalid ISBN
Terms of availability
Qualifying information
--
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER
Incorrect ISSN
--
ISSN-L
International Standard Serial Number 2
024 ## - OTHER STANDARD IDENTIFIER
Source of number or code
--
Additional codes following the standard number or code
Terms of availability
Standard number or code
Qualifying information
028 ## - PUBLISHER OR DISTRIBUTOR NUMBER
Publisher or distributor number
--
Source
029 ## - OTHER SYSTEM CONTROL NUMBER (OCLC)
OCLC library identifier
--
System control number
032 ## - POSTAL REGISTRATION NUMBER
Postal registration number
--
Source agency assigning number
035 ## - SYSTEM CONTROL NUMBER
System control number
--
--
Canceled/invalid control number
--
--
037 ## - SOURCE OF ACQUISITION
Note
--
Terms of availability
Stock number
Source of stock number/acquisition
040 ## - CATALOGING SOURCE
Description conventions
-- rda
Original cataloging agency
Modifying agency
Language of cataloging
Transcribing agency
041 ## - LANGUAGE CODE
Language code of librettos
--
Language code of text/sound track or separate title
Language code of summary or abstract
Language code of accompanying material other than librettos and transcripts
Language code of original
Language code of accessible visual language
043 ## - GEOGRAPHIC AREA CODE
Geographic area code
--
Local GAC code
045 ## - TIME PERIOD OF CONTENT
Formatted 9999 B.C. through C.E. time period
--
Time period code
050 ## - LIBRARY OF CONGRESS CALL NUMBER
Classification number
--
Supplementary class number (MU) [OBSOLETE]
Item number 2
-- 0
051 ## - LIBRARY OF CONGRESS COPY, ISSUE, OFFPRINT STATEMENT
Copy information
--
Classification number
Item number
055 ## - CLASSIFICATION NUMBERS ASSIGNED IN CANADA
Classification number
--
Item number
060 ## - NATIONAL LIBRARY OF MEDICINE CALL NUMBER
Classification number
--
Item number
070 ## - NATIONAL AGRICULTURAL LIBRARY CALL NUMBER
Classification number
--
Item number
072 ## - SUBJECT CATEGORY CODE
Source
--
--
Subject category code
Subject category code subdivision
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number
--
--
Item number 2
--
084 ## - OTHER CLASSIFICATION NUMBER
Number source
--
Classification number
086 ## - GOVERNMENT DOCUMENT CLASSIFICATION NUMBER
Number source
--
Classification number
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR)
--
--
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN)
--
092 ## - LOCALLY ASSIGNED DEWEY CALL NUMBER (OCLC)
Filing suffix
--
Classification number
Item number
096 ## - LOCALLY ASSIGNED NLM-TYPE CALL NUMBER (OCLC)
Classification number
--
Item number
097 ## -
--
--
--
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term
--
Personal name Mora-Manatad, Ma. Lourdes.
Dates associated with a name
Numeration 4
Affiliation
Titles and words associated with a name 0
Fuller form of name 16
110 ## - MAIN ENTRY--CORPORATE NAME
Relator term
--
Corporate name or jurisdiction name as entry element
Date of meeting or treaty signing
Subordinate unit
Number of part/section/meeting
Location of meeting
Form subheading
111 ## - MAIN ENTRY--MEETING NAME
Meeting name or jurisdiction name as entry element
--
Date of meeting or treaty signing
Number [OBSOLETE]
Number of part/section/meeting
Location of meeting
130 ## - MAIN ENTRY--UNIFORM TITLE
Version
--
Uniform title
Name of part/section of a work
Date of a work
Language of a work
Form subheading
210 ## - ABBREVIATED TITLE
Abbreviated title
--
Qualifying information
222 ## - KEY TITLE
Key title
--
Qualifying information
240 ## - UNIFORM TITLE
Version
--
Uniform title
Medium of performance for music
Miscellaneous information
Number of part/section of a work
Date of a work
Language of a work
Arranged statement for music
Name of part/section of a work
Form subheading
245 #0 - TITLE STATEMENT
Title
-- Proposed port management model to modernize selected LGU-port enterprises towards the development of an efficient and financially viable transport network system /
Designation of section section/part/series: (SE) [OBSOLETE]
Remainder of title
Number of part/section of a work
Statement of responsibility, etc. Ma. Lourdes Mora-Manatad.
Medium 6
Name of part/section of a work
246 ## - VARYING FORM OF TITLE
Title proper/short title
--
Remainder of title
Number of part/section of a work
Display text
Date or sequential designation 6
Name of part/section of a work
249 ## -
--
--
--
250 ## - EDITION STATEMENT
Linkage
--
Edition statement
Remainder of edition statement
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of manufacture
--
Place of publication, distribution, etc.
Name of publisher, distributor, etc.
Manufacturer
Date of publication, distribution, etc.
Date of manufacture
264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Materials specified
--
Place of production, publication, distribution, manufacture
--
Name of producer, publisher, distributor, manufacturer
Date of production, publication, distribution, manufacture, or copyright notice 46
300 ## - PHYSICAL DESCRIPTION
Accompanying material
--
Dimensions 28 cm.
Extent xv, 363 pages
Other physical details
310 ## - CURRENT PUBLICATION FREQUENCY
Current publication frequency
--
Date of current publication frequency
321 ## - FORMER PUBLICATION FREQUENCY
Former publication frequency
--
Dates of former publication frequency
336 ## - CONTENT TYPE
Content type code
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Materials specified
-- 0
Media type code
Media type term unmediated
Source rdamedia
338 ## - CARRIER TYPE
Materials specified
-- 0
Carrier type code
Carrier type term volume
Source rdacarrier
340 ## - PHYSICAL MEDIUM
Source
-- 0
Color content
Font size
344 ## - SOUND CHARACTERISTICS
Source
--
Type of recording 0
Recording medium
347 ## - DIGITAL FILE CHARACTERISTICS
Source
--
File type 0
362 ## - DATES OF PUBLICATION AND/OR SEQUENTIAL DESIGNATION
Dates of publication and/or sequential designation
--
--
385 ## - AUDIENCE CHARACTERISTICS
Demographic group term
--
Audience term 2
410 ## - SERIES STATEMENT/ADDED ENTRY--CORPORATE NAME [OBSOLETE, CAN/MARC], [LOCAL, USA]
Title of a work
--
Subordinate unit
Corporate name or jurisdiction name as entry element
Volume number/sequential designation
440 ## - SERIES STATEMENT/ADDED ENTRY--TITLE
Name of part/section of a work
--
Title
International Standard Serial Number
Volume/sequential designation
490 ## - SERIES STATEMENT
Series statement
--
International Standard Serial Number
Volume/sequential designation
500 ## - GENERAL NOTE
General note
-- Thesis (Ph.D.) -- Pamantasan ng Lungsod ng Maynila, 2007.;A dissertation presented to the faculty of the Graduate School of Management in partial fulfillment of the requirements for the degree Doctor of Business Administration.
--
--
-- 56
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note
--
--
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note
--
--
Title
Miscellaneous information
Statement of responsibility
506 ## - RESTRICTIONS ON ACCESS NOTE
Terms governing access
-- 5
510 ## - CITATION/REFERENCES NOTE
Name of source
--
International Standard Serial Number
520 ## - SUMMARY, ETC.
Expansion of summary note
--
Assigning source
Summary, etc. This study entitled Proposed Port Management Model to Modernize Selected LGU-Port Enterprises Towards the Development of an Efficient and Financially Viable Transport Network System assessed the current practices of LGUs, DOTC and PPA/CPA in the administration and management of ports, the problems encountered in the present LGU port management set-up as a result of the current practices, and the recommended measures to overcome problems encountered. The objective is to formulate a model to modernize selected LGU-Port Enterprises to encourage LGU and private sectors investment in port development and operation. The study is limited to three selected LGUs presently operating and managing public ports located in Pilar, Sorsogon, Cataingan, Masbate and Bogo, Cebu which are included in the Medium Term Philippine Development Plan (DSDP) as probable routes for the establishment of the Central Nautical Highway. It attempted to answer the following questions: 1.
521 ## - TARGET AUDIENCE NOTE
Target audience note What is the assessment and corresponding reasons for the rating made by the respondents on the current practices of LGUs in the administration and management of ports as to planning, organizing, staffing, leading, directing and controlling? 2.
525 ## - SUPPLEMENT NOTE
Supplement note What is the assessment and corresponding reasons for the rating made by the respondents on the current practices of DOTC and PPA/CPA in the administration and management of ports? 3.
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note What is the assessment and corresponding reasons for the rating made by the respondents on the problems encountered in the present LGU port management set-up as a result of the current practices of DOTC, PPA/CPA and LGU? 4.
533 ## - REPRODUCTION NOTE
Physical description of reproduction What is the assessment and corresponding reasons for the rating made by the respondents on the recommended measures to overcome the problems encountered in the present LGU port management set-up? 5.
536 ## - FUNDING INFORMATION NOTE
Text of note Is there a significant difference in the perceptions of the respondents as to their management set-up and recommended measures to overcome problems encountered when they are grouped according to the following: (a)
538 ## - SYSTEM DETAILS NOTE
System details note LGU officials and staff; (b)
540 ## - TERMS GOVERNING USE AND REPRODUCTION NOTE
Authorization Regional Development Council (RDC) secretariat or the National Economic and Development Authority (NEDA) regional officials and staff; (c)
542 ## - INFORMATION RELATING TO COPYRIGHT STATUS
Copyright date DOTC officials and staff; (e)
546 ## - LANGUAGE NOTE
Language note PPA officials and staff; (f)
550 ## - ISSUING BODY NOTE
Issuing body note Provincial Development Council (PDC) secretariat or the Provincial Planning Development Office (PPDO) and Provincial Engineering Office (PEO), (g)
555 ## - CUMULATIVE INDEX/FINDING AIDS NOTE
Cumulative index/finding aids note CPA officials and staff, and, (h)
580 ## - LINKING ENTRY COMPLEXITY NOTE
Linking entry complexity note What is the present financial performance of selected LGU-Port Management Body (PMB) at the infant stage after turnover by DOTC? 7.
583 ## - ACTION NOTE
Institution to which field applies What are the alternative strategies to improve the present LGU port management system and the corresponding advantages/disadvantages of strategic options? 8.
588 ## - SOURCE OF DESCRIPTION NOTE
Source of description note What port management model can be developed to improve and modernize selected LGU-Port Enterprises towards the development of an efficient and financially viable transport network system? The research tested the null hypothesis at 0.05 margin of error or 95% level of confidence: HO₁ There is no significant difference on the perceptions of respondents as to their assessment on the current practices, problems encountered in the LGU port management set-up, and recommended measures to overcome problems encountered when they are grouped according to the following: (a)
590 ## - LOCAL NOTE (RLIN)
Local note LGU officials and staff; (b)
591 ## -
-- Regional Development Council (RDC) secretariat or the National Economic and Development Authority (NEDA) regional officials and staff; (c)
592 ## -
-- DBP officials and staff; (d)
598 ## -
-- DOTC officials and staff; (e)
600 ## - SUBJECT ADDED ENTRY--PERSONAL NAME
Numeration PPA officials and staff; (f)
610 ## - SUBJECT ADDED ENTRY--CORPORATE NAME
Subordinate unit Provincial Development Council (PDC) secretariat or the Provincial Planning Development Office (PPDO) and Provincial Engineering Office (PEO), (g)
611 ## - SUBJECT ADDED ENTRY--MEETING NAME
Meeting name or jurisdiction name as entry element CPA officials and staff, and, (h)
630 ## - SUBJECT ADDED ENTRY--UNIFORM TITLE
General subdivision National Development Corporation-Maritime Equity Corporation (NDC-MEC). The study utilized the descriptive type of research applying the Input-Process-Output Model. The research instruments used survey questionnaires administered to 100 respondents belonging to 8 groups (LGU, RDC, DBP, DOTC, PPA, PDC, CPA and NDC) to determine the validity of the null hypothesis. The hypothesis test was performed using the analysis of variance (ANOVA) and F-test to draw inference about the variance in the perception of the 8 groups of respondents. When the null hypothesis was rejected in the ANOVA (meaning there is a significant difference in the assessment of 8 independent groups), multiple comparison test (Dunnet T3 Test) of the sample means is conducted to determine which group means are responsible for the difference in rating among the group means. Focused Group Discussion (FGD) with the 8 groups of respondents were conducted to obtain more data and to clarify the ratings given by the respondents and to discuss related issues, concerns and recommendations given by the respondents. For the analysis of secondary data gathered such as the financial performance of selected LGU-PMB, the researcher did the following: (1) Projected Attainable Revenues and Costs with Improved Management Practices, and (2) Sensitivity Analysis. In terms of the assessment of LGU practices and financial analysis on LGU performance, the dissertation concluded that the current practices of LGUs in port administration and management as to planning, organizing, staffing, leading, directing and controlling are not adequate and that it resulted to the following: (1) poor performance of PMB/ low earnings of PMB; (2) practices which are not favorable/ encouraging for private sectors to invest in port development and operation; (3) LGU giving subsidy to PMB for salaries of personnel; and (4) National Government periodically giving subsidy for the repair, upgrading, rehabilitation and expansion of the ports which the LGUs presently operate. In terms of the assessment of DOTC practices, the dissertation concluded that: (1) DOTC does not adequately monitor the performance of LGU-PMBs operating government ports due to inadequate monitoring and feedback mechanism as well as lack of permanent office to periodically monitor LGU-PMB performance. As a result, DOTC could not give the corresponding advice/ sanctions to LGU-PMBs which are found not complying to the terms and conditions of the MOA; (2) DOTC does not adequately coordinate the rationalization of port development throughout the country which affects sustainability /viability of the ports and therefore, is not encouraging to private sectors, and (3) DOTC cannot adequately provide the funds for the repair, rehabilitation, upgrading and expansion of existing public ports due to budgetary constraints of the national government. In terms of the assessment of PPA/CPA practices, the dissertation concluded that: (1) PPA/CPA adequately prescribes rules/ regulations, procedures and guidelines as well as performs regulatory function of ports. However, it cannot adequately and consistently develop, maintain, rehabilitate, upgrade and operate adequate number of public ports throughout the country because it has to maintain primarily its corporate viability, (2) PPA coordination with DOTC and other port development bodies for the rationalization of port development and operation is not adequate. (3) PPA implementation/review of the port tariffs along the existing Strong Republic Nautical Highway is not adequate because presently tariffs along the network are not uniform. (4) PPA issued policy guidelines on the transfer of the administration of government ports to LGUs in recognition to the provision of the Local Government Code of 1991 is not adequate because it is not attractive or does not encourage LGU investment in ports. (5) PPA does not adequately provide technical assistance to LGUs in the operation and management of government ports because PPA is not included in the existing MOA (involving only DOTC and LGUs). Since PPA/CPA has the mandate on port operation, it is necessary that PPA/CPA be involved in the MOA on the transfer of operation and management of the ports to LGUs by the National Government (DOTC). The findings of the study resulted to the development of the Proposed Port Management Model to Modernize Selected LGU-Port Enterprises Towards the Development of an Efficient and Financially Viable Transport Network System. The components of the model consist of the proposed Manual of Operation and Management for LGU-PMB, the proposed monitoring and feedback mechanism entitled Performance Standard and Rating System for LGU-PMB, and the proposed policy advocacies to support the modernization of LGU-Port Enterprises. The following are the implications/significance of the findings and conclusions of the dissertation: (1) The proposed port management model can be used to improve/modernize the management organization of selected LGUs-PMBs operating national government ports. The improvement/modernization of management set-up of LGU-PMB will ensure greater discipline in the operation and management of ports, professionalize the management of PMB, and improve the efficiency and viability of PMB. (2) Subsequently, the modernization of selected LGUs-PMBs will provide the proper mechanisms for the total devolution of National Government ports to deserving LGUs. The devolution of ports will properly define the transfer of ownership of ports to deserving LGUs which will pave the way to increased LGU participation in the investment and development of ports. It will be a useful tool of the National Government to catalyze the development of Super Regions through the full devolution of government ports to LGUs. Most of all, (3) Clearly defined ownership and modernized management structure of LGU-PMBs will make it attractive to private sectors to enter into contract / agreement with them for investment in the development and operation to say, the central RoRo network system because it wil
--
648 ## - SUBJECT ADDED ENTRY--CHRONOLOGICAL TERM
Source of heading or term
Chronological term
--
653 ## - INDEX TERM--UNCONTROLLED
Uncontrolled term
--
Uncontrolled term
--
--
--
--
710 ## - ADDED ENTRY--CORPORATE NAME
Subordinate unit
Location of meeting
Corporate name or jurisdiction name as entry element 5
730 ## - ADDED ENTRY--UNIFORM TITLE
Version
Miscellaneous information
Date of a work
740 ## - ADDED ENTRY--UNCONTROLLED RELATED/ANALYTICAL TITLE
--
Uncontrolled related/analytical title
--
774 ## - CONSTITUENT UNIT ENTRY
Title
--
Series data for related item
Qualifying information
Main entry heading
Edition
776 ## - ADDITIONAL PHYSICAL FORM ENTRY
Uniform title
Main entry heading
Edition
800 ## - SERIES ADDED ENTRY--PERSONAL NAME
Personal name
Numeration
Volume/sequential designation
Title of a work
Titles and other words associated with a name 2
Fuller form of name
Personal name
International Standard Serial Number 0
--
Dates associated with a name
--
810 ## - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element
Subordinate unit
Volume/sequential designation
Title of a work 2
International Standard Serial Number
Corporate name or jurisdiction name as entry element
Form subheading 0
Name of part/section of a work
--
Date of meeting or treaty signing 6
--
830 ## - SERIES ADDED ENTRY--UNIFORM TITLE
International Standard Serial Number
Uniform title
Date of treaty signing
Number of part/section of a work 2
-- 0
Volume/sequential designation
942 ## - ADDED ENTRY ELEMENTS
Institution code [OBSOLETE]
--
Institution code [OBSOLETE]
--
-- 20
--
Holdings
Withdrawn status Lost status Damaged status Not for loan Date acquired Total Checkouts Date last seen Price effective from
        2025-09-20   2025-09-20 2025-09-20

© Copyright 2024 Phoenix Library Management System - Pinnacle Technologies, Inc. All Rights Reserved.