Faster construction projects with CPM scheduling / Murray B. Woolf. 6
By: Murray B. Woolf. 4 0 16 [, ] | [, ] |
Contributor(s): 5 6 [] |
Language: Unknown language code Summary language: Unknown language code Original language: Unknown language code Series: ; New York : Mc Graw-Hill. c200746Edition: Description: xiii,412pContent type: text Media type: unmediated Carrier type: volumeISBN: 978-0-07-1486-60-6ISSN: 2Other title: 6 []Uniform titles: | | Subject(s): -- 2 -- 0 -- -- | -- 2 -- 0 -- 6 -- | 2 0 -- | -- -- 20 -- | | -- -- -- -- 20 -- | -- -- -- 20 -- --Genre/Form: -- 2 -- Additional physical formats: DDC classification: | LOC classification: | | 2Other classification:| Item type | Current location | Home library | Collection | Call number | Status | Date due | Barcode | Item holds |
|---|---|---|---|---|---|---|---|---|
| Book | PLM | PLM Circulation Section | Circulation-Circulating | 690.0684 W883f 2007 (Browse shelf) | Available | C32687 |
Browsing PLM Shelves , Shelving location: Circulation Section , Collection code: Circulation-Circulating Close shelf browser
|
|
|
|
|
|
|
||
| 690.068 C774c 2009 Construction planning, programming and control / | 690.068 M88c 2010 Construction project scheduling and control / | 690.0684 K95g 2010 Green construction project management and cost oversight / | 690.0684 W883f 2007 Faster construction projects with CPM scheduling / | 690.094 Ar25 1993 Architectural technology up to the scientific revolution : the art and structure of large-scale buildings / | 690.11 B814f 1997 Foundation behavior and repair : Residential and light construction / | 690.12 B79c 1998 Cladding of building / |
56
5
5

There are no comments for this item.