Construction scheduling, cost optimization, and management / H. Adeli and A. Karim. 6

By: Adeli, Hojjat, 4 0 16, 1950- [, ] | [, ] |
Contributor(s): 5 6 [] |
Language: Unknown language code Summary language: Unknown language code Original language: Unknown language code Series: ; New York : Spon Press, ©2001.46Edition: Description: 25 cm. xvi, 320 pagesContent type: text Media type: unmediated Carrier type: volumeISBN: 041524417X (hardcover)ISSN: 2Other title: 6 []Uniform titles: | | Related works: 1 40 1971- Karim, Asim Salimul, 6 [co-author.]Subject(s): -- 2 -- 0 -- -- | -- 2 -- 0 -- 6 -- | 2 0 -- | -- -- 20 -- | | -- -- Management.;Cost control. Construction industry;Production scheduling.;Building -- -- 20 -- | -- -- -- 20 -- --Genre/Form: -- 2 -- Additional physical formats: DDC classification: | 624.068 Ad32c 2001 LOC classification: | TH438.4 | .A33 20012Other classification:
Contents:
Action note: In: Summary: Other editions:
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Home library Collection Call number Status Date due Barcode Item holds
Book PLM
PLM
Graduate School Library
Graduate School-Circulating TH 438.4 .A34 2001 (Browse shelf) Available G29808
Total holds: 0

56

Includes bibliographical references and index.

5

Professional.

5

There are no comments for this item.

to post a comment.

© Copyright 2024 Phoenix Library Management System - Pinnacle Technologies, Inc. All Rights Reserved.