Assessment of the causes of delay in the Manila Water Supply Rehabilitation Project II (MWSRP) completion / Wilson I. Inong. 6
By: Inong, Wilson I. 4 0 16 [, ] | [, ] |
Contributor(s): 5 6 [] |
Language: Unknown language code Summary language: Unknown language code Original language: Unknown language code Series: ; 46Edition: Description: 28 cm. 97 pagesContent type: text Media type: unmediated Carrier type: volumeISBN: ISSN: 2Other title: 6 []Uniform titles: | | Subject(s): -- 2 -- 0 -- -- | -- 2 -- 0 -- 6 -- | 2 0 -- | -- -- 20 -- | | -- -- -- -- 20 -- | -- -- -- 20 -- --Genre/Form: -- 2 -- Additional physical formats: DDC classification: | LOC classification: | | 2Other classification:| Item type | Current location | Home library | Collection | Call number | Status | Date due | Barcode | Item holds |
|---|---|---|---|---|---|---|---|---|
| Book | PLM | PLM Graduate School Library | Graduate School-Thesis/Dissert | TH 438 .I56 1996 (Browse shelf) | Available | G186 |
Thesis (M.A.) -- Pamantasan ng Lungsod ng Maynila, 1996.;A directed study presented to the faculty of Graduate School of Engineering in partial fulfillment of the requirements for the degree Master of Engineering Management (MEM) with specialization in Construction Management. 56
5
5

There are no comments for this item.