Assessment of the priority factors causing time and cost overruns in the ongoing constructions of selected railway projects in Mega Manila (Record no. 36855)

000 -LEADER
fixed length control field 02401nam a22002417a 4500
003 - CONTROL NUMBER IDENTIFIER
control field FT8720
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250930100922.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250930b ||||| |||| 00| 0 eng d
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title engtag
050 ## - LIBRARY OF CONGRESS CALL NUMBER
Classification number TA401 A24 2023
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number .
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Abeleda, Allan I.; De Guzman, Kimberly Ann A.; Doroja, Gerald Joe L.; Tamina, Vince Lodivic O
245 ## - TITLE STATEMENT
Title Assessment of the priority factors causing time and cost overruns in the ongoing constructions of selected railway projects in Mega Manila
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Manila:
Name of producer, publisher, distributor, manufacturer PLM,
Date of production, publication, distribution, manufacture, or copyright notice 2023
300 ## - PHYSICAL DESCRIPTION
Other physical details Undergraduate Thesis: (Bachelor of Science in Civil Engineering) - Pamantasan ng Lungsod ng Maynila, 2023
336 ## - CONTENT TYPE
Source text
Content type term text
Content type code text
337 ## - MEDIA TYPE
Source unmediated
Media type term unmediated
Media type code unmediated
338 ## - CARRIER TYPE
Source volume
Carrier type term volume
Carrier type code volume
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note ABSTRACT: Mega Manila is the core location for trade, businesses, and opportunities in the Philippines. Hence, it has also been the center for development and construction of railway infrastructure projects. Time and cost overruns are inevitable in construction project management. This study aims to assess the priority factors causing time and cost overruns in the construction of ongoing railway infrastructure projects along Mega Manila. Fifty each for both time and cost overruns were identified through the literature review process. A survey questionnaire was used for data collection to calculate the severity and frequency index of each factor. The factors were ranked based on the Importance Index. Pareto-Analysis was used for the identification of the priority factors. Results show that there are 37 and 38 priority factors for both time and cost overruns, respectively. The priority factors for time overruns include delay in handling over site to contractor, delay of payment to the contractor and inadequate planning and scheduling. On the other hand, priority factors for cost overruns include price changes, delay of payment to the contractor and changes in the scope of work on site. With these means, a monitoring guide for time and cost overruns was generated using the determined priority factors. This proposed guide can possibly be utilized by the transportation sector, contractors, consultants, and future researchers to keep track of the indicators of time and cost overruns for better project management.
526 ## - STUDY PROGRAM INFORMATION NOTE
Classification Filipiniana
655 ## - INDEX TERM--GENRE/FORM
Genre/form data or focus term academic writing
942 ## - ADDED ENTRY ELEMENTS
Source of classification or shelving scheme
Item type Thesis/Dissertation
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Fund Source Total Checkouts Full call number Barcode Date last seen Price effective from Item type
          Filipiniana-Thesis PLM PLM Filipiniana Section 2025-07-16 donation   TA401 A24 2023 FT8720 2025-09-30 2025-09-30 Thesis/Dissertation

© Copyright 2024 Phoenix Library Management System - Pinnacle Technologies, Inc. All Rights Reserved.